CATSPARE.com Toolkit

Aggregate Calculator

Estimate the volume, weight and approximate number of bulk bags required for gravel, sand, ballast, limestone and other aggregates.

Enter the area and material

m
m
mm
t/m³
%
kg
Typical defaults: Material density and bag weight vary with grading, moisture and supplier. All assumptions can be edited before ordering.
Please enter dimensions and assumptions greater than zero.

Estimated results Live

Surface area—Length multiplied by width.
Net aggregate volume—Volume at the entered depth.
Net material weight—Based on the editable material density.
Suggested order quantity—Includes a 10% allowance.
Approximate bulk bags—Rounded up using 800 kg bags.
Enter the required dimensions to estimate aggregate quantities.
Planning estimate only: bulk density changes with aggregate type, grading, moisture and compaction. Confirm the supplied product, coverage and bag or loose-load weight with the merchant or quarry.

How the aggregate calculation works

Area = length × width
Volume = area × depth
Tonnes = volume × material density
Order quantity = tonnes × (1 + allowance)
  • Millimetre depth is converted to metres.
  • The bulk-bag figure is rounded up to a whole bag.
  • Split irregular areas into simple rectangles and add the totals.

Looking for more free construction and civil engineering tools and calculators?
Explore the CATSPARE.com Toolkit for drainage, earthworks, concrete, aggregates and other practical tools for engineers, contractors and groundworkers.

Articles From Our Blog

Modern workspace with brownfield redevelopment models and site planning materials
Brownfield Sites Have Lost BNG. Are They Actually Cheaper to Build On Now?Construction Industry

Brownfield Sites Have Lost BNG. Are They Actually Cheaper to Build On Now?

Read More
7 Groundworks Questions Councils Should Ask Before Building New HomesCivil EngineeringGroundworks

7 Groundworks Questions Councils Should Ask Before Building New Homes

Read More
10 Ways To Get Better Value From A Groundworks Tender In A Quiet Market
10 Ways to Get Better Value From a Groundworks Tender in a Quiet MarketGroundworks

10 Ways to Get Better Value From a Groundworks Tender in a Quiet Market

Read More
water infrastructure
Water Infrastructure Becoming a Major UK Construction PriorityConstruction NewsDrainagePumping Stations

Water Infrastructure Becoming a Major UK Construction Priority

Read More